Held the lab's first group meeting and dinner with Nahye Kim, Sungwoo Kim, Jitae Kim, and Inhee Han.
Our paper "Monte Carlo tree search for the multi-crane scheduling problem with temporal constraints" has been accepted to Flexible Services and Manufacturing Journal (FSMJ).
Our paper "Towards a unified model for flexible job shop scheduling problems" has been accepted to NeurIPS 2026.
Our paper "A unified learning framework for the block relocation problem: A new performance baseline" has been accepted to European Journal of Operational Research (EJOR).
Woo-Jin Shin joined the School of Industrial and Systems Engineering at GNU as an Assistant Professor.